← All security solutions Operational risk reduction

Roulette Wheel Integrity and Level Control

A roulette wheel must be correctly installed and periodically checked to support consistent game operation. A documented level-control routine helps technical teams identify installation movement, floor settlement or adjustment requirements before they affect play.

Roulette Wheel Integrity and Level Control
01

Control the balltrack, not the cabinet

Measurements taken directly from the roulette balltrack provide the relevant reference for wheel operation. GS wheel levels use stable multi-point support to make checks repeatable.

02

Build a routine inspection record

Check after installation, relocation, maintenance or any suspected impact. Record readings and corrective adjustments so the operator has a clear technical history.

03

Select the right inspection tool

GS Elite provides a refined spring-loaded three-point instrument, while GS Utility offers an economical tool for practical routine checks.